Sunday, August 23, 2009

Interior Update

A very busy couple of weeks at Lot 4, outside and in! On the interior, the wiring, plumbing and ventelation have all been istalled and breezed through town inspection. Outer walls are insulated and ceilings prepared to be finished. Piles of wallboard and plaster are everywhere and start going up on Tuesday. This first photo is the kitchen and the door on the left leads through the laundry room and into the garage.




The fireplace is bricked . Just beyond you can see a bit of the sunroom (definitely our favorite room!)

And the stairs are completed into the basement, which has a floor and lights.




The last pic here is a shot of the very impressive ceiling in the great room. To the left is the kitchen and that will be the powder room to the right.


The kitchen is finalized and on order. We expect that to be ready to install around September 20th. The tiles, carpets and hardwood are all selected as well as the paint (did you ever realize just how many shades of white there are!!) Most of the lighting is purchased, although we are still deciding on the exterior lighting. Last thing on the list for this week is we need to order the hot tub, which needs to be installed in the basement within a couple of weeks so that Mike can begin the landscaping.



No comments:

Post a Comment