Showing posts with label decisions. Show all posts
Showing posts with label decisions. Show all posts

Thursday, October 1, 2009

9/26 Getting Busy

We pulled up to the house to see a big truck in the yard again. The septic system is being installed. Mike is excited to be getting to the landscaping soon. We've decided on one last upgrade. We asked Mike what we could do to make the landscaping really stunning. He said it was already going to be stunning! Then he thought a minute and suggested a cobblestone sidewalk. I've always liked flagstone and hesitated a moment, but as he talked, I began to visualize it and realized it would be a perfect compliment to the front of the house. Tom, as always, said if that is what I want, that is what we will have. I do so like that attitude!
A lot of changes inside, but not great photo opportunities, especially since the painter was covering everything up to prepare to paint.

Trim, sills, molding and frames are all completed as is the subflooring where tiles will be going. That includes the master shower, which now looks like a great gray box.

Permanent stairs are now installed in the basement and main living area. Aren't these just georgous! This bannister is stunning!

We wandered the rooms for about an hour, measuring for blinds and trying to place furniture.

A phone call from George - the kitchen guy - tells us that the cabinets have finally arrived and will begin installation next week.

Mike made a mantle for us that we really liked. Perspective here is tough, this stands about shoulder high on Tom. We started looking at glass doors for the fireplace and went into serious sticker shock! Starting at around $850, they can go up to $3-4,000!
As we were getting ready to leave, Tom noticed something we'd missed all along. There wasn't a cap on the chimney. It just hadn't occured to us sooner, but having chased critters out of the fireplace in the past, we knew it was important. The fireplace guy will now be coming back, once the deck is in place so he doesn't have to rebuild his staging, to add on a chimney cap. It is really important to read the specs as you are going along to be sure you fully understand if all your wants and needs are understood.

So now we are nearing the finish and both Tom and I have long lists of things to get done. My job is to get notices of the move out to everyone, the apartment, movers, storage company, post office, new furniture delivery and so on. Tom will arrange for all of the new services and finish up with the mortgage requirements. Busy, busy!

Tuesday, July 21, 2009

Tiles and more shopping

A great part of last Saturday was spent at the showrooms at Classic Tile in Medway. By the time we were done with our selections the entire floor in both showrooms were covered in tiles! The laundry room (which is also the entry from the garage into the kitchen), 3 bathrooms, the shower and the backsplash behind the cooktop all require tiles. Oh, and that funky ledge in the main entry hall, which can only be viewed coming down the stairway from the second floor (but since were are putting plants up there it needs protection from water spillage). We selected a bunch of tiles and Debbie (our consultant - who threatened to flee if I pointed my camera in her direction!) gave us the samples to take home and live with for a while. We went straight to the house and laid everything out to try and imagine how it would look. From our first try we are keeping our choices for the shower, the backsplash and the powder room. The floor tiles for the master bath turned a chalky color in the light of the room and the pale ivory for the guest bath upstairs washed right out. So we'll be back to try again for those rooms. I'll post pics of the chosen tiles later this week once I drag them out of the trunk of the car!

Saturday was an exhausting 10 hour day. Besides the tiles, we shopped, unsuccessfully, for lighting (more on that later), ran to Sears to get one more quote on appliances, met with Mike to discuss the changes to the bathroom. Success, the toilet has a new location, the doorway to the master bath is framed for a pocket window and the kitchen wall will be extended to fit a full sized refridgerator instead of the cabinet-depth fridge I thought I wanted. It amazes me that we have a builder who accepts my ever-changing opinions and says "no problem" and then makes it happen! We straggled home at 7pm then sat up half the night working on the decisions left to make. Tom, who has the serenity and patience of the Dali Lhama, is still patient, but maybe not so serene. We called a hiatus on house decisions on Sunday and tried to catch up on the rest of our lives! These couple of weeks will be the worst of it. I do have to admit, as frustrating as it is, it is also great fun!

Tuesday, July 14, 2009

A Milestone



These photos from Saturday show the roof installed in front. They were working frantically to get the back done that day (they did). The chimney base (yea, sorry Mike, what DO you call that?) in the basement is now in as well. Sorry Donavan, your idea for an elevator in the fireplace hole was very cool, but we decided to stick with a fireplace! Siding and windows are ordered and will be here next week sometime. POST POST CORRECTION Gary says the windows are here!!


Back again on Sunday to do a walkthrough with Mike. He was able to work out additional storage and we were thrilled with that. We were thrilled with everything! Well almost… We were in the master bathroom and I’m chattering away about doors and lighting and such when Tom, very quietly says, “um, I have a question…” Uh oh! Turns out while I was designing our glorious European shower, I hadn’t accounted for the full swing of the pivot door. It was going to hit the privacy wall alongside of the commode. A few panicked minutes, some options tossed around, a bit of sketching and we have what looks like a new plan. Mike will have to run it by the plumber and work out some final details, but it looks good, and we like this layout even better.

Busy week to come – it is decision time. George will have the kitchen and bath designs for us to approve any day. We meet with the tiling company next Saturday to select all of the tiles. We will be doing a walkthrough with the electrician soon, so we had to sit with the floorplans and decide where switches and sockets and such were going to go. I thought that was going to be easy, but it was a lot of decisions to make. Low voltage or solar along the drive? Do we need a light in that closet? Where exactly are the track lights going and how do we place the switches? The basement – but we aren’t finishing the basement! Oh yea, I suppose overhead lighting makes sense, and outlets too. When I said I always wanted that big spotlight on the front of the house at Christmas time, Tom decided it was time for bed…